Use of Engineering Record and Lead Change Master.

$
0
0

Hello Gurus,

 

I would like to know the difference between the Engineering Record and the Lead Change Master it creates in the background.In the Eng.record,all the details are entered ( like objects that requires the change).At a configured status the ER creates a change master which is used to make the changes in the respective objects.

Hence I have to enter all the objects again in the Change master screen so that the respective changes are captured in the system.

 

I am entering a different ER number and the change master number is different. I use the change master number to capture the changes to the objects.My question is "Why can't I use the ER directly to capture the changes and why is the lead change master required used to make the changes".

 

Its like duplicating the same steps in Web portal as well in the ECC. Why should I use ER when I do through the change master.

Hope I am not confusing.

 

These are some questions raised by the clients.

 

This sounds little basic but any thoughts or inputs would be appreciated.

 

Thanks & Regards

Jo Pz