Quantcast
Channel: SCN : Discussion List - Product Lifecycle Management (SAP PLM)
Viewing all articles
Browse latest Browse all 721

Engineering change management for affected or dependent objects

$
0
0

Dear All,

 

I am new to this ECM area , i know that change numbers are usually linked to material master or BOM ,  but my client has a requirement to display the affected objects for this material/BOM like transactional data (Network , Planned order , Production order , PIR , PR , PO and Inventory stock) in a report.

 

So that they can check the affected transactional data in the report and change the status of the change number. This process they are currently doing in their legacy system and they want to have the same in SAP. I tried to check in query if the change number table AENR has any link to Network , PIR or Purchase order tables , but could not get the key field or link to join the tables.

 

I also got this user exit specific to Change number , but not sure if this helps the requirement.

 

PCCD0001  ECM: customer error in change master

PCCD0002  ECM: check values for effectivity type

PCCD0003  ECM: Check when setting a system status

PCCD0004  ECH: Check before saving the change number

PCCD0005  ECM: Check following initial screen (dynpro 100)

PCCD0006  Parameter effectivity: Format effectivity output contro

 

Appreciate if you could provide me your inputs on this topic.

 

Thanks

Benny


Viewing all articles
Browse latest Browse all 721

Latest Images

Trending Articles



Latest Images

<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>