I am trying to create the following scenario in SAP (ECC 6.0):
1. We have a number of DG sets of varying capacities feeding power requirements for different areas and functions (operations) of plant (a large petrochemical complex).
2. Maintenance tasks have to be carried out periodically based on manufacturer's recommendations based on hours run or calendar period. For example the "B Check" has to be carried out every 250 hours of actual running hours OR every SIX Months, whichever is earlier?
3. Once the limit is reached the system to generate a maintenance order automatically.
Can you please help me by describing precise sequence of steps that I must follow? I want the system to generate the order on reaching the threshold of SIX months even when the DG set has not been run at all. (I have already crated objects such as FLOC/equip etc.)
Thanks for help.