Quantcast
Channel: SCN : Discussion List - Product Lifecycle Management (SAP PLM)
Viewing all articles
Browse latest Browse all 721

VC -Saving the configuration of a line item when plant is changed.

$
0
0

Hi All

 

My question is related to VC. let say i have configurable material and configuration of this material is dependent on plant .

i have created a sales order with this material and maintain the configuration required for this material in the sales order with a particular plant and saved the SO.

Now  when i go back to the sales order and change the plant of the line item ,the configuration which i have maintained earlier is being wiped out and i do have to maintain the configuration once again .

Please advice on how i can save the configuration as it is while switching the line item to a different plant.

 

Thanks& regards


Viewing all articles
Browse latest Browse all 721

Trending Articles