Hi, I need your help to advise
The case is I using the DMR with "for usage decision". The sample of DMR is 3-5-1.
For the first 3 lots has been accepted then the next lot will come as skip lot (Quality level 200)
If my skip lot keep counting until lot number 7 (skip 1, skip 2, skip 3, skip4) and the next coming lot is pending for UD. In the meantime, my receiving do receive the new lot which is should be re-inspect (Quality level 300).
But due to one pending UD, then the new receiving is also count as skip lot instead of re-inspection lot. Then the skip lot will be 6 not 5 as DMR setting
What I need to know any block or alert message from SAP, could help on this. MY needed is need to have the lot follow DMR 3-5-1. Thank you for your help in advance.