Hi Team,
Can we automate the Engineering Record status Vs item status?
Let me explain the scenario, In Engineering Record, as you know there are different standard statuses available as provided by SAP. If any Engineering Record reached to status 20, when we select the item (for e.g: Material or Document) as an affected item to the engineering record, the status of the item should automatically selected to "INIT" based on the engineering record status. When an ER reached to 30 status the item status should also change automatically to "INPR" without manually changing the status of the item.
Can anyone come across this type of scenario? If yes, request you to provide your inputs for the same which will be great help for me.
Thanks a lot,
Prasad.